|








| |
|
McNamara Custom Services,
Inc. was founded as a piping contractor in 1982 and we continue to
offer a full line of piping services to our customers to this day. Our
mechanical division has expanded to include services such as: building
erection, demolition, excavation, plant equipment relocation, asphalt &
concrete services. In addition to the expansion of our mechanical service
capability, we have added two more divisions to better serve our customers.
Our refrigeration division
- MCS Refrigeration specializes in commercial/industrial service.
We offer the capability of servicing low & medium temp equipment as well as
standard heating, ventilating and air conditioning (HVAC) services. Our
capabilities range from preventive maintenance and repair services to
complete new construction & remodel.
Our plumbing division
Pine Plumbing offers a full array of services in the plumbing
industry. Projects range from small bathroom remodels to large scale
renovation projects as well as new construction. Other services include
camera and line locate services, jetting services and full scale repairs of
almost any size.
McNamara Custom Services,
Inc. owns and maintains heavy equipment to insure timely response to our
customers needs. In most cases, we can deliver backhoe equipment,
forklifts, shoring, etc. within a matter of hours not days. Additionally,
we offer dump truck and 18-wheel tractor/trailer services.
McNamara Custom Services,
Inc. has been providing quality service to our customers for over 25 years;
our goal is to provide our customers with professional service with a
personal touch. We meet this goal each day by using specifically trained
craftsmen and technicians. Listed below is a small sample of projects that
have been completed over the years. The projects listed serve to illustrate
our capabilities of meeting the wide ranging demands of our customers.
 |
TX
DOT, Various locations in Central Texas,
January 2009 Present. Preventive Maintenance/Repair Contract HVAC
services at 13 locations throughout central Texas. Demand Welding and
Plumbing service. |
 |
Thermal Technologies, Inc., Temple and Terrell, TX.
April
2008 August 2009. Fabricate and install Glycol piping systems
for medium temp ripening rooms at Wal Mart Distribution Centers.
|
 |
Mars
Pet Care, Temple, TX
December 2008 July 2009, Steam line repairs and installation,
extruding equipment re-piping & stainless steel repairs. RPZ
installation & testing services. |
 |
L-3
Communications, Waco, TX April 2009 June 2009. Install 100 Hp Air
Compressor, Desiccant Dryer and related equipment. Erect air compressor
building and finish out walls, duct work, exhaust system, etc. |
 |
L-3
Communications, Waco, TX
July
2009 - Install aircraft tie downs on runway for securing C-130 aircraft.
Includes concrete coring, installation of 10 ft deep anchor points and
concrete finish. |
 |
Big
Creek Construction, Hewitt, TX November
2006 July 2009. Hot oil loop fabrication and installation. Custom
fabricate 10,000 feet of schedule 80 carbon steel piping loops for steam
heat application for asphalt tanks. |
 |
McLennan Community College, Waco, TX
February 2009. Demo and replace hot water boiler for Olympic pool to
include expansion tanks and related accessories. |
 |
Wilsonart International, Temple, TX
October
2008. Reset four 5000 gallon Melamine tanks and reconnect 4 stainless
steel weld pipe to production loop as required. |
 |
Carpenter Company, Temple, TX
October
2008. Demo and remove 30 ft tall by 12 ft diameter holding silo to include
demolition of concrete pad and patch back of areas to match surrounding
parking lot. |
 |
Lochridge Priest, Inc.,
Waco, TX April 2008 May 2008. Baylor University Brick Boiler removal
Demo three each brick boilers 30 feet long x 25 feet tall x 20 feet
wide and renovate area for installation of replacement equipment.
|
 |
University of Mary-Hardin
Baylor, Belton, TX March 2008. Physical Plant-2 pipe system. Replace
400 ft of 6 chill water piping through parking lot area and tie back in
to chill water loop to include parking lot repairs. |
 |
Allergan, Waco, TX June
2007. Dust collector relocation remove and relocate dust collector for
plant operations. Sterile fill #4 clean room equipment install control
air lines. |
 |
Allergan, Waco, TX
April 2007. Water Room Condensate Receiver remove and relocate equipment
in clean room area. |
 |
Aramark, Waco, TX April
2007. Baylor University Fine Arts building remove and replace building
heat boiler. |
 |
Allergan, Inc. Waco, TX
December 2006 January 2007 Perform preventive maintenance on Makeup air
units, AHU's & exhaust fans as directed by Allergan maintenance. Services
included filter changes, bearing replacements, sheave replacements, belt
replacements & alignments, motor replacements, lubrication, etc. |
 |
University of Mary-Hardin
Baylor, Belton, TX. June 2006. Clark Hall sewer line replacement 600
feet of 6 sewer main replacement to include sidewalk and parking lot
repairs. |
 |
Aramark, Waco, TX
October 2006 Baylor University Marina boiler replacement. |
 |
Lochridge Priest, Inc.,
Waco, TX June 2006 August 2006, Baylor University Brooks Hall
Expansion modify chill water piping systems. |
 |
Allergan, Inc. Waco, TX
December 2005. USP Purified Water Modification. Clean Steam Modifications
for Mezzanine Removal |
 |
Allergan, Inc., Waco, TX
January 2005. Autoclave Clean Steam Piping and exhaust hood
installation |
 |
Waco JATC Apprentice School, Waco, TX.
April 2005 - August 2005. Installation of complete HVAC systems throughout
school. |
 |
Temple Veterans Administration
Hospital, Temple, TX. August 2005. Replace boiler feed water
piping throughout entire campus. |
 |
Allergan Shutdown.
December 2004 Installed high purity clean steam & USP Water. Replaced all boiler feed water piping in boiler house. |
 |
Central
Texas College, Killeen, TX, Planetarium and Technology Building.
2001-2002. Installation of Mechanical and Plumbing systems. Mechanical
includes underground chilled water and steam piping to heat exchangers. VAV
and rooftop units are used to provide cooling and heating to the projection
dome and classrooms. |
 |
Baylor
University, Waco, TX, Tennis Complex. 2001
Install complete plumbing system. |
 |
Baylor
University, Waco, TX, Truett Seminary. 2001
Install complete plumbing in multistory classrooms and chapel. |
 |
Sweetheart
Cup, Dallas, TX. 2001
Install new air compressors, air receivers and chillers in existing
facility. This project required extensive modifications to piping in the
mechanical room. All work was coordinated with the plant. Piping was
prefabricated and installed during scheduled shutdowns to minimize
production loss. |
 |
East
Texas Medical Center, Fairfield, TX. 2001 Emergency Room Remodel and Addition. Install HVAC system. |
 |
VA
Medical Center, Waco, TX, Building 11 Remodel. 2000
Assisted general contractor with installation of plumbing system and mechanical piping. |
 |
Baylor
University, Waco, TX.
2000 Install 6,000 linear feet of 14 underground chilled water lines to
new Law School. 1998-1999 Install 1- 2000 ton electric chiller, 1-1000
ton electric chiller, 1-1500 ton absorption chiller, 1-70 million BTU heat
recovery boiler with new 80ft stack, complete remodel of piping system,
including new 30 pipe headers while plant was in operation. |
 |
Anheuser-Bush
Refrigerated Warehouse,
Waco, TX
Aug
1999 to June 2000 - Install refrigeration system |
 |
Wilsonart
International. 1994 relocation of power boiler and piping. 1996-1997- Performance
contracting Removal of existing air compressors, demolition of piping,
installation of new piping air compressors and equipment. 1997-Installation
of 2900 hp boilers. 1999 Installation of high temperature, high-pressure piping
system for #6 Laminate Press.
|
"Professional Service With a Personal Touch"

McNamara Custom Services, Inc.
230 McNamara Lane
Waco, TX 76708
(254) 836-4304
FAX
(254) 836-4222
Glenn D. McNamara,
President
Email
Mon-Fri 7:30am -- 5pm
24hr Emergency Service Available
|
|