Home
Company History
Refrigeration/AC
Excavation
Mechanical
Plumbing
Job Opportunities
Credit Application

 

McNamara Custom Services, Inc. was founded as a piping contractor in 1982 and we continue to offer a full line of piping services to our customers to this day. Our mechanical division has expanded to include services such as: building erection, demolition, excavation, plant equipment relocation, asphalt & concrete services. In addition to the expansion of our mechanical service capability, we have added two more divisions to better serve our customers. 

Our refrigeration division - MCS Refrigeration – specializes in commercial/industrial service. We offer the capability of servicing low & medium temp equipment as well as standard heating, ventilating and air conditioning (HVAC) services. Our capabilities range from preventive maintenance and repair services to complete new construction & remodel.

Our plumbing division – Pine Plumbing – offers a full array of services in the plumbing industry. Projects range from small bathroom remodels to large scale renovation projects as well as new construction. Other services include camera and line locate services, jetting services and full scale repairs of almost any size. 

McNamara Custom Services, Inc. owns and maintains heavy equipment to insure timely response to our customers’ needs. In most cases, we can deliver backhoe equipment, forklifts, shoring, etc. within a matter of hours – not days. Additionally, we offer dump truck and 18-wheel tractor/trailer services.

McNamara Custom Services, Inc. has been providing quality service to our customers for over 25 years; our goal is to provide our customers with “professional service with a personal touch”. We meet this goal each day by using specifically trained craftsmen and technicians. Listed below is a small sample of projects that have been completed over the years. The projects listed serve to illustrate our capabilities of meeting the wide ranging demands of our customers.

 

bullet

TX DOT, Various locations in Central Texas, January 2009 – Present. Preventive Maintenance/Repair Contract HVAC services at 13 locations throughout central Texas. Demand Welding and Plumbing service. 

bullet

Thermal Technologies, Inc., Temple and Terrell, TX.  April 2008 – August 2009. Fabricate and install Glycol piping systems for medium temp ripening rooms at Wal Mart Distribution Centers.

bullet

Mars Pet Care, Temple, TX December 2008 – July 2009, Steam line repairs and installation, extruding equipment re-piping & stainless steel repairs.  RPZ installation & testing services. 

bullet

L-3 Communications, Waco, TX April 2009 – June 2009.  Install 100 Hp Air Compressor, Desiccant Dryer and related equipment. Erect air compressor building and finish out walls, duct work, exhaust system, etc.

bullet

L-3 Communications, Waco, TX July 2009 - Install aircraft tie downs on runway for securing C-130 aircraft. Includes concrete coring, installation of 10 ft deep anchor points and concrete finish.

bullet

Big Creek Construction, Hewitt, TX November 2006 – July 2009.  Hot oil loop fabrication and installation. Custom fabricate 10,000 feet of schedule 80 carbon steel piping loops for steam heat application for asphalt tanks.

bullet

McLennan Community College, Waco, TX February 2009. Demo and replace hot water boiler for Olympic pool to include expansion tanks and related accessories.

bullet

Wilsonart International, Temple, TX October 2008. Reset four 5000 gallon Melamine tanks and reconnect 4” stainless steel weld pipe to production loop as required.

bullet

Carpenter Company, Temple, TX October 2008. Demo and remove 30 ft tall by 12 ft diameter holding silo to include demolition of concrete pad and patch back of areas to match surrounding parking lot.

bullet

Lochridge Priest, Inc., Waco, TX April 2008 – May 2008. Baylor University Brick Boiler removal – Demo three each brick boilers – 30 feet long x 25 feet tall x 20 feet wide and renovate area for installation of replacement equipment.

bullet

University of Mary-Hardin Baylor, Belton, TX March 2008. Physical Plant-2 pipe system. Replace 400 ft of 6” chill water piping through parking lot area and tie back in to chill water loop to include parking lot repairs.

bullet

Allergan, Waco, TX June 2007. Dust collector relocation – remove and relocate dust collector for plant operations. Sterile fill #4 clean room equipment – install control air lines.

bullet

Allergan, Waco, TX April 2007. Water Room Condensate Receiver – remove and relocate equipment in clean room area.

bullet

Aramark, Waco, TX April 2007. Baylor University Fine Arts building – remove and replace building heat boiler.

bullet

Allergan, Inc. Waco, TX December 2006 – January 2007 Perform preventive maintenance on Makeup air units, AHU's & exhaust fans as directed by Allergan maintenance. Services included filter changes, bearing replacements, sheave replacements, belt replacements & alignments, motor replacements, lubrication, etc.

bullet

University of Mary-Hardin Baylor, Belton, TX. June 2006. Clark Hall sewer line replacement – 600 feet of 6” sewer main replacement to include sidewalk and parking lot repairs.

bullet

Aramark, Waco, TX October 2006 Baylor University Marina boiler replacement.

bullet

Lochridge Priest, Inc., Waco, TX June 2006 – August 2006, Baylor University Brooks Hall Expansion – modify chill water piping systems.

bullet

Allergan, Inc. Waco, TX December 2005. USP Purified Water Modification. Clean Steam Modifications for Mezzanine Removal

bullet

Allergan, Inc., Waco, TX January 2005. Autoclave Clean Steam Piping and exhaust hood installation

bullet

Waco JATC Apprentice School, Waco, TX.  April 2005 - August 2005. Installation of complete HVAC systems throughout school.

bullet

Temple Veterans Administration Hospital, Temple, TX.  August 2005.  Replace boiler feed water piping throughout entire campus.

bullet

Allergan Shutdown.  December 2004 Installed high purity clean steam & USP Water.  Replaced all boiler feed water piping in boiler house.

bullet

Central Texas College, Killeen, TX, Planetarium and Technology Building. 2001-2002. Installation of Mechanical and Plumbing systems. Mechanical includes underground chilled water and steam piping to heat exchangers. VAV and rooftop units are used to provide cooling and heating to the projection dome and classrooms.  

bullet

Baylor University, Waco, TX, Tennis Complex.  2001 Install complete plumbing system. 

bullet

Baylor University, Waco, TX, Truett Seminary. 2001 Install complete plumbing in multistory classrooms and chapel. 

bullet

Sweetheart Cup, Dallas, TX. 2001 Install new air compressors, air receivers and chillers in existing facility. This project required extensive modifications to piping in the mechanical room. All work was coordinated with the plant. Piping was prefabricated and installed during scheduled shutdowns to minimize production loss. 

bullet

East Texas Medical Center, Fairfield, TX.  2001 Emergency Room Remodel and Addition. Install HVAC system.

bullet

VA Medical Center, Waco, TX, Building 11 Remodel. 2000 Assisted general contractor with installation of plumbing system and mechanical piping. 

bullet

Baylor University, Waco, TX.  2000 Install 6,000 linear feet of 14” underground chilled water lines to new Law School. 1998-1999 – Install 1- 2000 ton electric chiller, 1-1000 ton electric chiller, 1-1500 ton absorption chiller, 1-70 million BTU heat recovery boiler with new 80ft stack, complete remodel of piping system, including new 30” pipe headers while plant was in operation. 

bullet

Anheuser-Bush Refrigerated Warehouse, Waco, TX  Aug 1999 to June 2000 - Install refrigeration system 

bullet

Wilsonart International.  1994 relocation of power boiler and piping. 1996-1997- Performance contracting – Removal of existing air compressors, demolition of piping, installation of new piping air compressors and equipment. 1997-Installation of 2–900 hp boilers.  1999 Installation of high temperature, high-pressure piping system for #6 Laminate Press.

 

"Professional Service With a Personal Touch"

McNamara Custom Services, Inc.
230 McNamara Lane
Waco, TX 76708
(254) 836-4304
FAX (254) 836-4222
Glenn D. McNamara, President
Email

Mon-Fri 7:30am -- 5pm
24hr Emergency Service Available